Mobilization will begin August 20, 2019, with work continuing through the fall. Both bridges will be removed and replaced simultaneously, requiring the closure of East Road to through traffic. Traffic will be closed at McMullen Road and both ends of East Road.
Expected Start Date | August 20, 2019 |
Projected Completion Date | December, 2019 |
Traffic Impacts | Major, East Road open to local traffic open, no through travel possible |